YOUNIVERSE1 / PILOT DEVELOPMENT PACKAGE

Constellation interlink · baseline condition

Now. Growth. Your next decision.

Within model target · modeled outcome

Move mission data across representative interlinks. Calculated from a reference configuration and your inputs; this is not a measured acceptance result.

Primary utilization56%Now: 28% · Growth: 2×
Window delivery504 GBNow: 252 GB · Growth: 2×
Unserved data0 GBNow: 0 GB · Growth: 2×
Devices at next stage16Now: 8 · Growth: 2×

Capacity comparison · percentages may exceed 100%

Primary transport

Now 28%
Growth 56%

Gateway capacity

Now 14%
Growth 28%

Telemetry collector

Now 8%
Growth 16%

Selected pilot gates

Numerical checks for this pilot. Targets are test assumptions.
MeasureCurrent stateGrowth scenario
Capacity & headroomWithin targetWithin target
Window deliveryWithin targetWithin target
Buffer accumulationWithin targetWithin target
Window continuityWithin targetWithin target
Evidence completenessWithin targetWithin target
Path latencyWithin targetWithin target
Gateway aggregationWithin targetWithin target
Support coverageWithin targetWithin target

What the 15 agents found at the next stage

Galaxity

Evidence agent

Within model target

80% of required evidence is present; 2 items remain. Source review is still required.

Galaxity

Track-record agent

Sample history

12 → 5 incidents in the supplied comparison. Source: synthetic. This does not prove improvement caused by a solution.

Shared network

Capacity agent

Within model target

Aggregate traffic uses 56% of primary capacity; 880 Mbps headroom. Review threshold: 80%.

Shared network

Path-latency agent

Within model target

Modeled one-way link latency is 11.01 ms against a 50 ms target. Queueing and complete route behavior need separate measurement.

Star Jumper

Contact-window agent

Calculated estimate

Usable geometry occupies 66.67% of the window; primary time coverage after the availability assumption is 66%.

Star Jumper

Mission-delivery agent

Within model target

504 GB of 504 GB offered can be served in this fluid-flow approximation (100%).

Star Jumper

Buffer & recovery agent

Within model target

Unserved data: 0 GB against 200 GB buffer. Primary-contact drain time: 0 min.

Ground networks

Path-continuity agent

Within model target

Modeled time coverage is 99.83% against 99%. Coverage alone does not guarantee enough delivery capacity.

Ground networks

Gateway agent

Within model target

560 Mbps per gateway; 28% aggregate gateway utilization across 2 gateways.

Ground networks

Terminal-energy agent

Calculated estimate

Configured terminal energy is 1.28 kWh for the test window. Facility and supporting equipment energy is outside this estimate.

Galaxity

Telemetry agent

Within model target

32 events/sec; 16% collector utilization; 0.05 GB of event data in this window.

Galaxity

Crypto-inventory agent

Needs review

15 dependencies remain outside the declared ready set (25% ready). Compatibility and security testing remain required.

Shared network

Operations agent

Within model target

8 devices per operator; 20% of the supplied support envelope.

Shared network

Scaling agent

Within model target

16 devices in the growth scenario. Primary utilization changes from 28% to 56%; gateway, collection and support capacity stay fixed.

Coordination

Pilot coordinator

Within model target

Selected numerical gates are within the reference targets. Review evidence and run representative measurements before rollout.

Review all 18 model calculations

Traffic demand

Devices × average traffic per device.

Devices
16
Offered Mbps
1,120

Capacity & headroom

Offered load against configured aggregate capacity.

Utilization Pct
56
Headroom Mbps
880
Review Threshold Pct
80

Propagation delay

Distance divided by light speed, with fiber propagation factor.

One Way Ms
6
Medium
vacuum

Packet serialization

Packet size divided by available link rate.

Packet Ms
0.01

Path latency

Propagation, serialization and supplied processing delay.

One Way Ms
11.01
Target Ms
50
Scope
One modeled link; processing supplied. No measured queue or orbital path delay.

Contact duty cycle

Usable minutes divided by the modeled window.

Duty Pct
66.67
Primary Coverage Pct
66

Window delivery

Effective link capacity over usable contact time.

Effective Average Mbps
1,658.3
Offered GB
504
Delivered GB
504
Delivery Pct
100
Target Pct
95

Buffer accumulation

Unserved offered traffic over the modeled window.

Backlog GB
0
Buffer GB
200
Within Buffer
true

Backlog drain

Backlog divided by spare service rate during a usable contact.

Minutes
0
Spare Primary Mbps
880
Assumption
Drain time needs continuous usable primary contact; it excludes interruption time.

Alternate-path capacity

Primary loss and fallback contribution with capped delivery.

Primary Average Mbps
1,320
Alternate Average Mbps
338.3
Assumption
Alternate path available during gaps in primary coverage; independent availability.

Window continuity

Primary time coverage combined with independent fallback availability.

Coverage Pct
99.83
Target Pct
99
Scope
Time coverage approximation; throughput sufficiency evaluated separately.

Operating energy

Device power × device count × elapsed time.

K Wh
1.28
Scope
Terminals only; excludes site cooling, tracking, backhaul and standby equipment.

Gateway aggregation

Projected throughput per gateway and gateway headroom.

Per Gateway Mbps
560
Utilization Pct
28
Gateways
2

Telemetry pipeline

Device event rate against collection capacity; event volume.

Events Sec
32
Utilization Pct
16
Volume GB
0.05

Evidence completeness

Available evidence fields against required fields.

Coverage Pct
80
Missing
2
Scope
Completeness only; no verification of source truth.

Track-record comparison

Supplied before/after incident counts and source status.

Before
12
After
5
Change
-7
Reduction Pct
58.33
Source
synthetic
Scope
Synthetic or user-supplied comparison; not verified client results or causal evidence.

Crypto migration inventory

Known dependencies marked ready against inventoried dependencies.

Ready Pct
25
Remaining
15
Scope
Declared inventory readiness only; no security assurance or cryptographic testing.

Support coverage

Configured devices per operator against the supplied support limit.

Devices Per Operator
8
Coverage Utilization Pct
20
Operators
2
Review the exact test inputs
InputCurrent assumptionGrowth assumption
Devices816
Traffic Mbps7070
Capacity Mbps20002000
Growth22
Window Min6060
Contact Min4040
Primary Availability Pct9999
Fallback Mbps10001000
Fallback Availability Pct99.599.5
Distance Km18001800
Mediumvacuumvacuum
Processing Ms55
Packet Bytes15001500
Buffer GB200200
Power W8080
Gateways22
Gateway Capacity Mbps20002000
Events Per Device Sec22
Collector Events Sec200200
Event Bytes400400
Evidence Available88
Evidence Required1010
Incidents Before1212
Incidents After55
History Sourcesyntheticsynthetic
Crypto Total2020
Crypto Ready55
Operators22
Devices Per Operator4040
Target Latency Ms5050
Target Continuity Pct9999
Target Delivery Pct9595
Headroom Pct2020

Interpretation & next steps

Use the flagged measures to choose the next experiment. Agree the customer outcome, collect an authorized baseline, test representative load and recovery, then record a human acceptance decision. The coordinator issues no rollout approval and performs no network changes.

Youniverse1 test-environment report · version 1.0.0 · 2026-09-28T00:00:00.000Z. This is an example of the development package. Detailed client reports use the contracted scope, approved evidence and measured pilot outcomes.