Pilots & scaling

Prove a focused outcome. Then expand.

Start with a specific network requirement, define the baseline and use agreed acceptance criteria to guide the next stage.

Ready-to-test development package

Start with models, agents and pilots already built.

Explore 12 runnable pilots for Star Jumper, ground networks and Galaxity workflows. Every pilot includes 15 analysis agents, 18 engineering reference models and current-versus-growth reporting.

Choose a pilot

Test the connection your business depends on.

These pilot scopes are starting points. Duration, hardware, access, pricing and deliverables are agreed with each customer.

01

Terrestrial optical link

Evaluate a ground-to-ground link: site suitability, representative traffic, link quality and an agreed fallback.

02

Ground-segment readiness

Assess a candidate station, optical contact constraints, facility conditions and backhaul dependencies.

03

Star Jumper architecture

Model satellite contacts, interlink paths and gateway loading; validate representative interfaces in a controlled environment.

04

Enterprise gateway integration

Test the handoff, segmentation, routing, capacity and recovery against the customer network interfaces.

05

Post-quantum migration

Inventory a defined cryptographic dependency, assess compatibility and test a scoped migration path.

06

Scaling visibility

Use the agreed operational evidence to identify bottlenecks, capacity triggers and changes needed before adding sites or devices.

The pilot lifecycle

Every stage has an owner and an acceptance gate.

A pilot creates an evidence-backed decision about the next stage.

01

01 · Define

Agree the customer outcome, baseline, boundaries, dependencies and measurable targets.

02

02 · Prepare

Confirm approved access, selected equipment, test scenarios, rollback and operational responsibilities.

03

03 · Execute

Run the agreed scenarios and capture results, interruptions and operator observations.

04

04 · Accept

Review evidence with the customer, record exceptions and decide whether to expand, revise or stop.

Scaling is part of the pilot

Test the next stage before committing to it.

Growth changes traffic, devices, locations and the people needed to operate the service.

Current baseline→Representative load→Next-stage model→Customer acceptance

Results you can use

A pilot report that leads to a decision.

Report the baseline, measured results, customer outcome, exceptions and the recommended next scope.

01

Evidence

Scenario records, measurements and the conditions under which they were observed.

02

Recommendation

What can progress, what needs revision and what remains dependent on further engineering.

03

Service agreement

Scope, responsibilities, support, exclusions and service-level targets agreed around the delivered service.